April 1st, 2008 by alva

So far so good!
The new floor is installed, waiting for laminate flooring. The walls have been sheet rocked and are waiting for taping and texturing.
This entry was posted
on Tuesday, April 1st, 2008 at 1:23 pm and is filed under Uncategorized.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.